Latest Work 10
Busy on another rewire . All first fix and second fix powered up, tested and plastered before we left . A good job from the lads .
Basically, first fix is the term used for the work done before plastering, such as cabling and inserting back boxes. Second fix is the work done after plastering and includes fitting switches and accessories, and electrical testing.
Kitchen rewire. All plastered up neatly, ready for tiling.